UM  > Faculty of Science and Technology
Residential Collegefalse
Status已發表Published
Stability assessment of slurry shield tunnel excavation zone
Cheng, Y.1,2; Wu, Y.3; Zhou, W. H.1
2024
Source PublicationGeotechnical Aspects of Underground Construction in Soft Ground
PublisherCRC Press, Taylor & Francis Group
Pages464-470
Abstract

Tunneling in complex geotechnical conditions and in built-up urban areas is becoming widespread. The stability of the tunnel excavation zone is closely related to the construction process and the safety of adjacent buildings. For the stability of slurry shield tunneling face, an attempt is made to propose an analytical solution with pore pressure distribution field and to assess the stability of the excavation zone of shield tunnel based on upper bound solution. The proposed method incorporates the coupling effect of slurry infiltration while considering groundwater seepage. The safety factors and the support pressure that influenced by the slurry transform rate are analyzed.

KeywordExcavation Zone Pore Water Pressure Slurry Infiltration Upper Bound Limit
DOI10.1201/9781003413790-55
URLView the original
Language英語English
ISBN978-103253812-9; 978-100341379-0
Scopus ID2-s2.0-85202414680
Fulltext Access
Citation statistics
Document TypeBook chapter
CollectionFaculty of Science and Technology
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Affiliation1.State Key Laboratory of Internet of Things for Smart City and Department of Civil and Environmental Engineering, University of Macau, Macau SAR, China
2.Department of Civil and Environmental Engineering, The Hong Kong Polytechnic University, Hung Hom, Hong Kong SAR, China
3.China Civil Engineering Construction Corporation, Beijing, China
First Author AffilicationUniversity of Macau
Recommended Citation
GB/T 7714
Cheng, Y.,Wu, Y.,Zhou, W. H.. Stability assessment of slurry shield tunnel excavation zone[M]. Geotechnical Aspects of Underground Construction in Soft Ground:CRC Press, Taylor & Francis Group, 2024, 464-470.
APA Cheng, Y.., Wu, Y.., & Zhou, W. H. (2024). Stability assessment of slurry shield tunnel excavation zone. Geotechnical Aspects of Underground Construction in Soft Ground, 464-470.
Files in This Item:
There are no files associated with this item.
Related Services
Recommend this item
Bookmark
Usage statistics
Export to Endnote
Google Scholar
Similar articles in Google Scholar
[Cheng, Y.]'s Articles
[Wu, Y.]'s Articles
[Zhou, W. H.]'s Articles
Baidu academic
Similar articles in Baidu academic
[Cheng, Y.]'s Articles
[Wu, Y.]'s Articles
[Zhou, W. H.]'s Articles
Bing Scholar
Similar articles in Bing Scholar
[Cheng, Y.]'s Articles
[Wu, Y.]'s Articles
[Zhou, W. H.]'s Articles
Terms of Use
No data!
Social Bookmark/Share
All comments (0)
No comment.
 

Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.