Status | 已發表Published |
Process cost model for construction quality measurement: feedback and case study | |
Aoieong, RT; Tang, SL; Ahmed, SM | |
2003 | |
Conference Name | the Second International Conference on Construction in the 21st Century on Sustainability and Innovation in Management and Technology |
Source Publication | Proceedings of the Second International Conference on Construction in the 21st Century on Sustainability and Innovation in Management and Technology |
Pages | 56-61 |
Conference Date | 10-12 December 2003 |
Conference Place | Hong Kong |
URL | View the original |
Language | 英語English |
Document Type | Conference paper |
Collection | University of Macau |
Recommended Citation GB/T 7714 | Aoieong, RT,Tang, SL,Ahmed, SM. Process cost model for construction quality measurement: feedback and case study[C], 2003, 56-61. |
APA | Aoieong, RT., Tang, SL., & Ahmed, SM (2003). Process cost model for construction quality measurement: feedback and case study. Proceedings of the Second International Conference on Construction in the 21st Century on Sustainability and Innovation in Management and Technology, 56-61. |
Files in This Item: | There are no files associated with this item. |
Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.
Edit Comment