UM

Browse/Search Results:  1-3 of 3 Help

Selected(0)Clear Items/Page:    Sort:
Probabilistic Forecasting-Based Reserve Determination Considering Multi-Temporal Uncertainty of Renewable Energy Generation Journal article
Xu, Yuqi, Wan, Can, Liu, Hui, Zhao, Changfei, Song, Yonghua. Probabilistic Forecasting-Based Reserve Determination Considering Multi-Temporal Uncertainty of Renewable Energy Generation[J]. IEEE Transactions on Power Systems, 2024, 39(1), 1019-1031.
Authors:  Xu, Yuqi;  Wan, Can;  Liu, Hui;  Zhao, Changfei;  Song, Yonghua
Favorite | TC[WOS]:6 TC[Scopus]:7  IF:6.5/7.4 | Submit date:2024/02/22
Itã'-process Model  Multi-temporal Uncertainty  Probabilistic Forecasting  Ramp Capability Reserve  Regulating Reserve  Reserve Determination  
Surrogate Model-Based Multi-timescale Stochastic Control of Islanded Cascaded Hydro-Solar System Considering Non-Gaussian Uncertainty Conference paper
Zhipeng Yu, Yiwei Qiu, Jin Lin, Feng Liu, Yonghua Song, Gang Chen, Lijie Ding. Surrogate Model-Based Multi-timescale Stochastic Control of Islanded Cascaded Hydro-Solar System Considering Non-Gaussian Uncertainty[C]:IEEE, 2021, 982-988.
Authors:  Zhipeng Yu;  Yiwei Qiu;  Jin Lin;  Feng Liu;  Yonghua Song; et al.
Favorite | TC[WOS]:0 TC[Scopus]:0 | Submit date:2022/05/13
Automatic Generation Control  Hydro-solar System  Itô Process  Model Predict Control  Multi-timescales  Polynomial Chaos  Stochastic Control  Surrogate Model  Uncertainty  
A rank test for the number of factors with high-frequency data Journal article
Kong,Xin Bing, Liu,Zhi, Zhou,Wang. A rank test for the number of factors with high-frequency data[J]. Journal of Econometrics, 2019, 211(2), 439-460.
Authors:  Kong,Xin Bing;  Liu,Zhi;  Zhou,Wang
Favorite | TC[WOS]:5 TC[Scopus]:5  IF:9.9/6.7 | Submit date:2021/03/11
Continuous-time Factor Model  High-dimensional Itô Process  Idiosyncratic Process