UM

Browse/Search Results:  1-10 of 13 Help

Selected(0)Clear Items/Page:    Sort:
Expansion Planning of Soft Open Points Based Distribution System Considering EV Traffic Flow Journal article
Shen,Yichen, Zhang,Shenxi, Ding,Maosheng, Cheng,Haozhong, Li,Canbing, Liu,Dundun. Expansion Planning of Soft Open Points Based Distribution System Considering EV Traffic Flow[J]. IEEE Transactions on Industry Applications, 2023, 60(1), 1229-1239.
Authors:  Shen,Yichen;  Zhang,Shenxi;  Ding,Maosheng;  Cheng,Haozhong;  Li,Canbing; et al.
Favorite | TC[WOS]:1 TC[Scopus]:3  IF:4.2/4.5 | Submit date:2023/08/03
Distribution System Planning  Ev Navigation  Soft Open Points  Traffic Flow  Transportation Network  
Co-Planning of Regional Wind Resources-based Ammonia Industry and the Electric Network: A Case Study of Inner Mongolia Journal article
Li, Jiarong, Lin, Jin, Heuser, Philipp, Heinrichs, Heidi, Xiao, Jinyu, Liu, Feng, Robinius, Martin, Song, Yonghua, Stolten, Detlef. Co-Planning of Regional Wind Resources-based Ammonia Industry and the Electric Network: A Case Study of Inner Mongolia[J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2022, 37(1), 65-80.
Authors:  Li, Jiarong;  Lin, Jin;  Heuser, Philipp;  Heinrichs, Heidi;  Xiao, Jinyu; et al.
Favorite | TC[WOS]:23 TC[Scopus]:36  IF:6.5/7.4 | Submit date:2022/02/21
Co-planning Model  Electric Network (En)  Inner Mongolia  Load Model Of Power-to-ammonia (Pta)  The Admm Algorithm  Wind-to-ammonia (Wta)  
Multi-stage Planning Method for Distribution Network Considering Building Integrated Energy Station Conference paper
Li, Yunman, Gao, Hongjun, He, Shuaijia, Li, Haibo, Zhang, Hongcai, Lao, Keng Weng, Zhang, Jianglin. Multi-stage Planning Method for Distribution Network Considering Building Integrated Energy Station[C], 2021, 45-50.
Authors:  Li, Yunman;  Gao, Hongjun;  He, Shuaijia;  Li, Haibo;  Zhang, Hongcai; et al.
Favorite | TC[WOS]:0 TC[Scopus]:0 | Submit date:2021/12/08
Building Integrated Energy Station (Ies)  Distribution Network Planning  Multi-stage Planning  
Waiting Cost Based Long-Run Network Investment Decision-Making under Uncertainty Journal article
Yan, Xiaohe, Gu, Chenghong, Zhang, Hongcai, Li, Furong, Song, Yonghua. Waiting Cost Based Long-Run Network Investment Decision-Making under Uncertainty[J]. IEEE Transactions on Power Systems, 2021, 36(4), 3340-3348.
Authors:  Yan, Xiaohe;  Gu, Chenghong;  Zhang, Hongcai;  Li, Furong;  Song, Yonghua
Favorite | TC[WOS]:1 TC[Scopus]:2  IF:6.5/7.4 | Submit date:2021/09/09
Long-run Incremental Cost  Network Planning  Real Options  Uncertainty  
Six-DOF Spacecraft Optimal Trajectory Planning and Real-Time Attitude Control: A Deep Neural Network-Based Approach Journal article
Chai, Runqi, Tsourdos, Antonios, Savvaris, Al, Chai, Senchun, Xia, Yuanqing, Chen, C. L.Philip. Six-DOF Spacecraft Optimal Trajectory Planning and Real-Time Attitude Control: A Deep Neural Network-Based Approach[J]. IEEE Transactions on Neural Networks and Learning Systems, 2020, 31(11), 5005-5013.
Authors:  Chai, Runqi;  Tsourdos, Antonios;  Savvaris, Al;  Chai, Senchun;  Xia, Yuanqing; et al.
Favorite | TC[WOS]:103 TC[Scopus]:118  IF:10.2/10.4 | Submit date:2021/12/06
Attitude Control  Bilevel Structure  Deep Neural Network (Dnn)  Six-degree-of-freedom (6-dof) Hypersonic Vehicle (Hv)  Trajectory Planning  
Joint optimization of statistical process control and maintenance policy under random maintenance Time: A GERT Network Method Conference paper
Li, Yaping, Shu, Lianjie. Joint optimization of statistical process control and maintenance policy under random maintenance Time: A GERT Network Method[C]:Research Publishing Services, 2020, 4915-4922.
Authors:  Li, Yaping;  Shu, Lianjie
Favorite | TC[Scopus]:0 | Submit date:2023/04/17
Gert Network  Maintenance Planning  Statistical Process Control  
A graph-based formulation for the shift rostering problem Journal article
Lai, D. S.W., Leung, J. M. Y., Dullaert, W., Marques, I.. A graph-based formulation for the shift rostering problem[J]. European Journal of Operational Research, 2019, 284(1), 285-300.
Authors:  Lai, D. S.W.;  Leung, J. M. Y.;  Dullaert, W.;  Marques, I.
Favorite | TC[WOS]:1 TC[Scopus]:6  IF:6.0/5.9 | Submit date:2022/08/22
Human Resource Planning  Shift Rostering  Personnel Rostering  Scheduling  Network Model  
Joint Optimization of Large-Scale Offshore Wind Farm Integration and Transmission Expansion Conference paper
Liu,Likai, Hu,Zechun, Qiu,Yiwei, Zhao,Boshi, Song,Yonghua. Joint Optimization of Large-Scale Offshore Wind Farm Integration and Transmission Expansion[C], 2019.
Authors:  Liu,Likai;  Hu,Zechun;  Qiu,Yiwei;  Zhao,Boshi;  Song,Yonghua
Favorite | TC[Scopus]:3 | Submit date:2021/03/09
Joint Planning  Linearized Ac Power Flow  Offshore Wind Farms Integration  Transmission Network Expansion  
Parametric planning model for video quality evaluation of IPTV services combining channel and video characteristics Journal article
Song Jiarun, Yang Fuzheng, Zhou Yicong, Gao Shan. Parametric planning model for video quality evaluation of IPTV services combining channel and video characteristics[J]. IEEE Transactions on Multimedia, 2017, 19(5), 1015-1029.
Authors:  Song Jiarun;  Yang Fuzheng;  Zhou Yicong;  Gao Shan
Favorite | TC[WOS]:11 TC[Scopus]:13 | Submit date:2018/12/21
Network Planning  Planning Model  Quality Of Experience (Qoe) Planning  Video Quality Assessment  Video Streaming Applications  
Parametric Planning Model for Video Quality Evaluation of IPTV Services Combining Channel and Video Characteristics Journal article
Song, Jiarun, Yang, Fuzheng, Zhou, Yicong, Gao, Shan. Parametric Planning Model for Video Quality Evaluation of IPTV Services Combining Channel and Video Characteristics[J]. IEEE TRANSACTIONS ON MULTIMEDIA, 2017, 19(5), 1015-1029.
Authors:  Song, Jiarun;  Yang, Fuzheng;  Zhou, Yicong;  Gao, Shan
Favorite | TC[WOS]:11 TC[Scopus]:13  IF:8.4/8.0 | Submit date:2018/10/30
Network Planning  Planning Model  Quality Of Experience (Qoe) Planning  Video Quality Assessment  Video Streaming Applications